Network cabling for an office move: what to decide, and in what order

In an office move, the cabling is ordered last and expected first: without it, no Wi-Fi, no telephony and no printers on moving-in day.

Layout decided, even provisionally? Send it with the address, the planned position of the rack and the move-in date to contact@gpc-reseaux.com, or call +33 4 28 29 05 16.

1. Have the existing cabling measured

The premises often already have cabling. It may be reusable, or it may not: only a measurement can tell. An audit with certification of the existing links shows, outlet by outlet, what carries the expected speed, what needs repairing and what is missing. If the landlord gives you access to the premises before you sign, it also helps you negotiate the works.

2. Fix the layout, then count

The price depends on the number of outlets and where they are, not on the floor area. Common rules of thumb:

  • two outlets per workstation;
  • two links per Wi-Fi access point position, in the ceiling;
  • meeting rooms: display, video conferencing, table;
  • printers, reception, access control, cameras, signage;
  • spare capacity: outlets added afterwards cost considerably more than outlets installed during the works.

3. Position the rack and the technical room

A ventilated, lockable location with a dedicated power supply, no more than 90 m of cable from the furthest outlet. On a large floor plate or several floors, a second patching point linked by fibre is sometimes needed. This has to be settled before the partitions go up. In leased premises, drilling, routes through the riser and use of a shared room generally need the landlord’s written consent.

4. Fit in with the fit-out contractor’s programme

The cable is pulled once the partitions are set out but not yet closed, and before the ceilings are closed; termination and testing come after painting and before the furniture. A one-week slip on the partitions means one week less to pull, terminate and test. The cabling contractor should be in the programme from the start, not called in once the ceilings are closed.

5. Order the carrier link early

The carrier’s fibre has its own lead times, counted in weeks and sometimes months. It does not depend on the cabling contractor; extending its delivery point to your rack, however, should be included in the cabling.

6. Require the tests and the file

At handover: a certification report for every link, an outlet layout drawing, identical labelling at the rack and at the outlet. This is what lets your IT provider plug in without searching, and find the source of a fault three years from now.

If you have no one to bring the network, Wi-Fi and telephony back into service after the move, tell us when you ask for the quotation: we can introduce you to a network and telephony integration company run by one of our co-owners. If you already have an IT provider, we work with them.


GPC Réseaux has been installing copper and fibre cabling since 2015, including in occupied premises, in Lyon and across Auvergne-Rhône-Alpes. We also work on behalf of fit-out contractors and IT service providers. contact@gpc-reseaux.com or +33 4 28 29 05 16.

Request a quotation

The information you enter is used by GPC Réseaux solely to respond to your enquiry and prepare a quotation. Find out more: privacy policy.

✉️ Email us 📝 Free quotation