Network rack re-patching and server room tidy-up, out of hours

A rack where nobody dares unplug a patch lead, a server room inherited from three contractors, a rack that is too small and has to be replaced without disrupting the business.

GPC Réseaux, a cabling contractor based in Lyon and working for businesses across Auvergne-Rhône-Alpes, takes on your patching in the evening, at the weekend or during a shutdown, and hands back an installation that is labelled, tidy and documented.

For a quotation, email photos of the rack (front and rear) to contact@gpc-reseaux.com: we reply in English.

When is it time to act?

  • Nobody knows which lead goes where, and the documentation, if any, is out of date.
  • Every job starts with half an hour of tracing, and sometimes ends with an outage nobody planned.
  • Patch leads run across the front of the equipment, hang down in metres of slack or stop the door from closing.
  • Some leads are plugged in at one end only; some ports are in use and nobody knows by what.
  • You are changing switches, telephony or IT support provider and want to start from a clean base.
  • The rack or comms room is full, poorly ventilated, or has to be moved.

What we do

  • Complete re-patching of a rack or floor distributor: old leads removed, new patching with leads of the right length, cable managers, colour coding, labelling.
  • Putting a comms room or server room back in order: several racks, copper and fibre links between racks, containment, PDUs inside the racks. The electrical distribution board remains the electrician’s job.
  • Replacing or extending a rack: patch panels and equipment transferred to the new rack where the cables have enough slack; otherwise the links are re-terminated, tested and certified. The new rack is fixed and earthed, and unused U-spaces are fitted with blanking panels for airflow.
  • Moving or consolidating racks during building works or a refit.
  • Adding panels, replacing connectors, replacing faulty links: we are cabling installers, so damaged links are redone, tested and certified.

Examples of our work

  • A higher-education institution, building after building since 2017: over 500 patch leads patched and labelled in the largest buildings, and thirteen switches reinstalled with the configurations supplied by the IT department.
  • The four distributors at a high-security site: survey during the day, then removal and re-patching out of hours.

Our method: nothing is unplugged before it has been traced

1. The survey

Before the cutover, during the day and with no scheduled outage, we record every patch lead: switch port, panel port, outlet served. Where your switches allow it, your IT team sends us the port export (descriptions, VLANs, PoE, LLDP/CDP neighbours); we cross-check it against the physical survey, which also identifies the leads that cannot be followed by hand. We photograph the rack from every angle.

We note what cannot be plugged back in just anywhere: switch-to-switch links, link aggregation groups, stacking cables, fibres and their polarity, PoE ports feeding access points, cameras or phones, dual power supplies and how they are split across the two feeds.

2. The cutover plan

With your IT team or your IT support provider, we agree the target layout, the sequence, the maintenance window and the list of services to check once service is restored.

  • By default, every outlet goes back to its original switch port. Any change of allocation is decided and configured by your IT team.
  • Equipment configuration remains your IT team’s responsibility. They back up the configurations, freeze changes between the survey and the cutover, shut down and restart servers and storage themselves, and stay on site or on call during the window.
  • A rollback is planned. We work switch by switch, each block validated before the next. If a block does not validate, it is plugged back exactly as it was, from the survey and the photographs. A decision cut-off time is set: beyond it, we do not start another switch, we stop at a stable point and the rest is rescheduled.

3. Preparation

Patch leads of the right length, cable managers, hook-and-loop ties, labels printed in advance, fixings, PDUs if needed: everything is ready before the outage, so that the whole window is spent fitting.

4. The work, out of hours

Evening, weekend or shutdown period; at night when the site requires it. The outage is announced in advance, with a start time and an end time. A server room is handled rack by rack, over several windows, rather than all at once. Fibre connectors are inspected and cleaned before reconnection, and minimum bend radii are observed.

5. Back in service

We check that every port has its link and its PoE power back; your IT team compares port status before and after. We then go through the list of services with them: internet access, servers, telephony, Wi-Fi, printers, access control, cameras. If you wish, attendance or on-call cover when staff return can be included in the quotation.

6. The documentation

Rack elevation, patching schedule (switch port, panel port, outlet, use), before and after photographs, matching labels at the rack and at the outlet. The next job, by us or by anyone else, starts from there.


A rack that needs sorting out? Email photos to contact@gpc-reseaux.com: we will tell you how we would tackle it.


More than tidying up

The tidiness is what you see; the skill lies in knowing what you are unplugging: telling a switch-to-switch link from a patch lead serving a desk outlet, an aggregated link from a duplicate, single-mode fibre from multimode, a PoE port from an ordinary one. We have been working since 2015 in racks belonging to public-sector bodies, healthcare facilities, educational establishments and industrial sites, alongside their IT teams.

What we need to quote

  • photographs of each rack, front and rear, with the door open;
  • the approximate number of patch leads and the number of switches;
  • whatever documentation exists, however old;
  • the windows available for an outage, and the equipment that must never stop;
  • out-of-hours access arrangements (badges, alarm, security staff);
  • the name of the person or provider who manages the network.

For a single floor cabinet, this is often enough to quote. For a server room, we visit the site. Free quotation within two working days of the site visit or of receiving your drawings.

Frequently asked questions

Does the network go down during the work?
Only the rack being worked on and whatever depends on it, during the agreed window (for a main rack: the floors and access switches it serves). Its links are interrupted switch by switch, and equipment is powered off only if it is being moved or its power feed is being reworked. That is why the work is prepared in advance and scheduled outside your working hours. Equipment that cannot stop is handled separately, link by link: with no interruption to service if the redundancy is confirmed by your IT team; otherwise with a brief interruption per link, whose length depends on the configuration.

Can our existing patch leads be reused?
Those in good condition and of the right length, yes. Over-long leads are one of the main causes of the mess, along with missing cable managers and successive additions: we replace them with leads of the right length.

Do you touch the switch configuration?
No: it remains your IT team’s. At their request, we load the files they supply, without changing them. We do, however, hand over an accurate schedule of what is plugged into each port.

What if we have no IT support to bring things back into service?
Tell us at quotation stage: we can bring in a network and telephony integration company run by one of our co-owners. If you already have a team or a provider, configuration remains their responsibility.

What if the survey reveals faulty links?
We report them before the cutover, with a price for putting them right. You decide.

Do you work on behalf of IT support providers?
Yes: see the page written for them.


GPC Réseaux — 12 rue de la Part-Dieu, 69003 Lyon, France · contact@gpc-reseaux.com · Tel: +33 4 28 29 05 16
For enquiries in English, email is the quickest route. See also: Structured cabling contractor in Lyon.

Request a quotation

The information you enter is used by GPC Réseaux solely to respond to your enquiry and prepare a quotation. Find out more: privacy policy.

✉️ Email us 📝 Free quotation